The Basement is Almost Done

The waterproofing and foam insulation was put on over the last few days.  
Also, the perimeter drain installation and pea gravel backfill got started.  The basement rough plumbing will be finished this weekend to make way for the floor concrete.
Next up is the backfilling of dirt around the foundation and finishing up the pea gravel on the floor (where concrete slabs will be poured).
Should be a good weekend!